Project Meeting 2024.11.05

rcopperman edited this page Nov 5, 2024 · 2 revisions

Agenda

  • Technical - Estimation Enhancements Updates
  • Admin - Phase 10A tasks

Technical

  • Estimation Enhancements Updates
    • Two zone system has been tricky, so working through details to make sure code is working correctly
    • Larch update - running MTC one-zone data through Larch using parquet files

General Admin

  • Phase 10A tasks
    • Tracing Memory Improvements with Sharrow #754
      • Need to get Sharrow data to write out to disk; Means of doing so is complicated and not straightforward
      • ARC marked it as a high priority, but OK with punting it; no immediate emergency
      • Can debug w/o tracing but have to get into debugger mode and stop execution in middle of running it - higher developer skillset to be able to do it
      • Level of effort is high, and uncertainty in achievability
      • 10A Decision: Punting
    • Improve Joint Tour Participation Model #569
      • Translink had issue during calibration; can not calibrate model directly and must run all three models jointly and use trial and error approach to hit number of joint tours that are reasonable by different segmentations
      • For other models you can calculate a target and adjust parameters directly until you hit the target; can use algorithm to get it to converge, but w/ joint tour model can not do that
      • Two task options
        • Quick fix to make it easier to calibrate
        • Design task to make joint tours better overall
      • 10A Decision: Punting
    • Input Checker Enhancements #894
      • Checker could catch most likely issues that occur
      • Duplicate of Item 9/#784 and Item 25/#873
      • Phase 10A: Combine all of these into single "project" and keep on short-list
    • Preprocessors and Annotators available for every model #895
      • Not available for location model; should be standardized across different models
      • Testing is what will take time
      • Phase 10A: Keep on short-list
    • Multi-year development roadmap
      • Deliverable would be integration of all materials that relate to consortium and roadmap; Update as necessary given all work that has been done since original roadmap
      • Phase 10A: Keep on short list
    • Very long time to write skims to shared data buffer when using sharrow
      • Solved a specific performance issue, but never got an answer to why it was bad in the first place
      • High level effort, uncertainty around solution; kind of have a work around
      • Ultimately should be fixed in open matrix
      • Phase 10A: Punting
    • Improve Data Model.. #728 and Level-of-service Manager #743
      • Level of effort high
      • Should be on roadmap, but may be too large for Phase 10A
      • Phase 10A: Punting
    • Testing Required for various directory solutions #902
      • Should be done, but can be rolled into maintenance and support
      • Phase 10A: rolled into maintenance and support; do not write up as separate task
    • SEMCOG Model taking longer to run using ActivitySim 1.3.1 with Sharrow... #904
      • High on usability improvement level of importance
      • Relates to Item #4/#906 - specification performance analysis tool
      • Medium level of effort
      • Phase 10A: Short-list
    • Got through list of everything David H ranked as medium
      • Those on David H's "Low" list can be addressed in the support task; should be prioritized so they can be addressed in order of importance, ideally
    • Need scope descriptions for items on short-list; Will reserve one meeting (Nov 12) for technical discussion on scope