-
Notifications
You must be signed in to change notification settings - Fork 99
Project Meeting 2024.04.11
Michelle Bina edited this page Apr 18, 2024
·
2 revisions
- Admin
- Liaison with European ABM association
- Phase 9a progress
- Joel to continue conversations with European ABM association
- Liaison with European ABM association
- Inquiry stemmed from European Transport Conference (ETC) where they noted they don’t have many ABMs and was looking to connect with ActivitySim
- Interest in ABMs in Europe, but they are very behind the US.
- Climate change and energy consumption are driving motivations
- A lot of individual operators have their own models
- Joe, Alex, or an agency staff could present to this group to show the viable collaboration across agencies and industry.
- Someone from Dubai asked MWCOG about their use of ActivitySim and MWCOG responded
- Currently closing out BayDAG PRs
- Working on various bug fixes
-
Automatically drop unneeded columns in choosers table
- Not sure if it’s windows vs mac thing; CS could test on their windows server.
- Sijia to see if she can duplicate her anomalous results.
- If problem goes away, move forward with merging.
- If problem does not go away, we’ll have more concrete information to evaluate and dig into it a little more.
-
Automatically drop unneeded columns in choosers table
- Run BayDAG end-to-end, possibly without sharrow
- CS working to run test-size BayDAG end-to-end without sharrow.
- Small issues with getting components to work with sharrow.
- The components that were written as extensions, and not as core components, don’t have all the same infrastructure to do things like skip sharrow. Jeff/CS went through all the core components to make a consistent set-up to skip sharrow in any of the core components. The extension models are out of sync of that, they will need to be updated in a similar way.
- There are instances where there is re-indexing that sharrow isn’t able to handle, so moving those to preprocessors. CS is about halfway through the components.
- In a few more days, hope to get through all the model components and show results.
- School escorting optimization is close to being done and should be run on the MTC example next week.
- Planning for a technical check-in on Tuesday