-
Notifications
You must be signed in to change notification settings - Fork 5.9k
Pull requests: pingcap/tidb
Author
Label
Projects
Milestones
Reviews
Assignee
Sort
Pull requests list
planner: fix a estimation case when column.hist.NDV is greater than topN.num.
ok-to-test
Indicates a PR is ready to be tested.
release-note-none
Denotes a PR that doesn't merit a release note.
sig/planner
SIG: Planner
size/XS
Denotes a PR that changes 0-9 lines, ignoring generated files.
#59564
opened Feb 16, 2025 by
AilinKid
Loading…
1 of 13 tasks
planner: add risk for out of range
do-not-merge/needs-linked-issue
release-note-none
Denotes a PR that doesn't merit a release note.
sig/planner
SIG: Planner
size/XL
Denotes a PR that changes 500-999 lines, ignoring generated files.
#59561
opened Feb 15, 2025 by
terry1purcell
Loading…
1 of 13 tasks
streamhelper: don't cut down connection when subscription stream closed
release-note-none
Denotes a PR that doesn't merit a release note.
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
#59559
opened Feb 14, 2025 by
YuJuncen
Loading…
1 of 13 tasks
storage/s3: add retry for h2 disconnection errors
release-note
Denotes a PR that will be considered when it comes time to generate release notes.
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
#59558
opened Feb 14, 2025 by
YuJuncen
Loading…
1 of 13 tasks
expression: avoid slicesgrow in the PushDownExprsWithExtraInfo
release-note-none
Denotes a PR that doesn't merit a release note.
size/XS
Denotes a PR that changes 0-9 lines, ignoring generated files.
#59556
opened Feb 14, 2025 by
hawkingrei
Loading…
1 of 13 tasks
planner: add a util function of finding common equivs between mutli fds. (#59355)
cherry-pick-approved
Cherry pick PR approved by release team.
ok-to-test
Indicates a PR is ready to be tested.
release-note-none
Denotes a PR that doesn't merit a release note.
sig/planner
SIG: Planner
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
type/cherry-pick-for-release-6.5
This PR is cherry-picked to release-6.5 from a source PR.
#59555
opened Feb 14, 2025 by
ti-chi-bot
Loading…
1 of 13 tasks
planner: fix planner can't error for union-all query when new-only-full-group-check is enabled (#59212)
cherry-pick-approved
Cherry pick PR approved by release team.
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
release-note-none
Denotes a PR that doesn't merit a release note.
sig/planner
SIG: Planner
size/XXL
Denotes a PR that changes 1000+ lines, ignoring generated files.
type/cherry-pick-for-release-6.5
This PR is cherry-picked to release-6.5 from a source PR.
#59554
opened Feb 14, 2025 by
ti-chi-bot
Loading…
1 of 13 tasks
Dumpling: GCS client always retry and also retry for 401 error. (#58198)
approved
cherry-pick-approved
Cherry pick PR approved by release team.
needs-1-more-lgtm
Indicates a PR needs 1 more LGTM.
release-note-none
Denotes a PR that doesn't merit a release note.
size/S
Denotes a PR that changes 10-29 lines, ignoring generated files.
#59553
opened Feb 14, 2025 by
OliverS929
Loading…
13 tasks
br: clone backend options
release-note-none
Denotes a PR that doesn't merit a release note.
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
#59549
opened Feb 14, 2025 by
Leavrth
Loading…
1 of 13 tasks
ddl: let partition table pre split index regions
release-note-none
Denotes a PR that doesn't merit a release note.
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
#59547
opened Feb 14, 2025 by
Defined2014
Loading…
1 of 13 tasks
statistics: add Destroy method and handle session recycling
needs-1-more-lgtm
Indicates a PR needs 1 more LGTM.
release-note
Denotes a PR that will be considered when it comes time to generate release notes.
sig/planner
SIG: Planner
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
#59546
opened Feb 14, 2025 by
Rustin170506
Loading…
1 of 13 tasks
Lightning: Skip apply ioworkers when seek(0, io.SeekCurrent) (#57454)
do-not-merge/cherry-pick-not-approved
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
release-note-none
Denotes a PR that doesn't merit a release note.
size/XS
Denotes a PR that changes 0-9 lines, ignoring generated files.
type/cherry-pick-for-release-6.5
This PR is cherry-picked to release-6.5 from a source PR.
#59544
opened Feb 14, 2025 by
ti-chi-bot
Loading…
2 of 13 tasks
importinto: automatic file type recognition based on file name characteristics
needs-ok-to-test
Indicates a PR created by contributors and need ORG member send '/ok-to-test' to start testing.
release-note
Denotes a PR that will be considered when it comes time to generate release notes.
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
#59543
opened Feb 14, 2025 by
River2000i
Loading…
3 of 13 tasks
prefetch: the prefetch buffer should be fully filled (#59496) | tidb-test=release-8.1.2
approved
needs-1-more-lgtm
Indicates a PR needs 1 more LGTM.
release-note-none
Denotes a PR that doesn't merit a release note.
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
#59539
opened Feb 14, 2025 by
lance6716
Loading…
13 tasks
prefetch: the prefetch buffer should be fully filled (#59496)
do-not-merge/cherry-pick-not-approved
release-note-none
Denotes a PR that doesn't merit a release note.
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
type/cherry-pick-for-release-8.5
This PR is cherry-picked to release-8.5 from a source PR.
#59538
opened Feb 14, 2025 by
ti-chi-bot
Loading…
2 of 13 tasks
prefetch: the prefetch buffer should be fully filled (#59496)
do-not-merge/cherry-pick-not-approved
release-note-none
Denotes a PR that doesn't merit a release note.
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
type/cherry-pick-for-release-8.1
This PR is cherry-picked to release-8.1 from a source PR.
#59537
opened Feb 14, 2025 by
ti-chi-bot
Loading…
2 of 13 tasks
metrics: add metrics for active users count
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
release-note-none
Denotes a PR that doesn't merit a release note.
size/XXL
Denotes a PR that changes 1000+ lines, ignoring generated files.
#59533
opened Feb 14, 2025 by
tiancaiamao
•
Draft
1 of 13 tasks
Lightning: fix performance regression introduced by behavior change of columnAPI.Cols()
approved
cherry-pick-approved
Cherry pick PR approved by release team.
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
lgtm
release-note-none
Denotes a PR that doesn't merit a release note.
size/S
Denotes a PR that changes 10-29 lines, ignoring generated files.
#59529
opened Feb 13, 2025 by
OliverS929
Loading…
2 of 14 tasks
br: fix log advancer to use resign rather than retire
do-not-merge/needs-tests-checked
release-note-none
Denotes a PR that doesn't merit a release note.
size/XS
Denotes a PR that changes 0-9 lines, ignoring generated files.
#59527
opened Feb 13, 2025 by
Tristan1900
Loading…
13 tasks
*: (6.5) fix TSO retrieval failure during read TS validation
cherry-pick-approved
Cherry pick PR approved by release team.
release-note
Denotes a PR that will be considered when it comes time to generate release notes.
size/S
Denotes a PR that changes 10-29 lines, ignoring generated files.
#59526
opened Feb 13, 2025 by
ekexium
Loading…
1 of 13 tasks
*: (7.1) fix TSO retrieval failure during read TS validation
cherry-pick-approved
Cherry pick PR approved by release team.
release-note
Denotes a PR that will be considered when it comes time to generate release notes.
size/S
Denotes a PR that changes 10-29 lines, ignoring generated files.
#59525
opened Feb 13, 2025 by
ekexium
Loading…
1 of 13 tasks
*: (7.5) fix TSO retrieval failure during read TS validation
cherry-pick-approved
Cherry pick PR approved by release team.
release-note
Denotes a PR that will be considered when it comes time to generate release notes.
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
#59523
opened Feb 13, 2025 by
ekexium
Loading…
1 of 13 tasks
statistics: release session met error to avoid possible leak
do-not-merge/needs-triage-completed
release-note
Denotes a PR that will be considered when it comes time to generate release notes.
sig/planner
SIG: Planner
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
#59522
opened Feb 13, 2025 by
winoros
Loading…
1 of 13 tasks
*: (8.1) fix TSO retrieval failure during read TS validation
cherry-pick-approved
Cherry pick PR approved by release team.
release-note
Denotes a PR that will be considered when it comes time to generate release notes.
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
#59521
opened Feb 13, 2025 by
ekexium
Loading…
1 of 13 tasks
*: (8.5) fix TSO retrieval failure during read TS validation
cherry-pick-approved
Cherry pick PR approved by release team.
release-note
Denotes a PR that will be considered when it comes time to generate release notes.
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
#59520
opened Feb 13, 2025 by
ekexium
Loading…
1 of 13 tasks
Previous Next
ProTip!
Mix and match filters to narrow down what you’re looking for.