Skip to content

Merge pull request #4676 from joroKr21/align-with #2858

Merge pull request #4676 from joroKr21/align-with

Merge pull request #4676 from joroKr21/align-with #2858

Triggered via push November 16, 2024 11:21
Status Failure
Total duration 10m 16s
Artifacts 8

ci.yml

on: push
Matrix: Build and Test
Matrix: Submit Dependencies
Matrix: Scalafix
Matrix: Generate Site
Matrix: Validate Steward Config
Matrix: Publish Artifacts
Fit to window
Zoom out
Zoom in

Annotations

5 errors
Build and Test (ubuntu-latest, 2.12, temurin@8, catsNative)
Process completed with exit code 1.
Build and Test (ubuntu-latest, 2.13, temurin@8, catsNative)
The job was canceled because "ubuntu-latest_2_12_temuri" failed.
Build and Test (ubuntu-latest, 2.13, temurin@8, catsNative)
The operation was canceled.
Build and Test (ubuntu-latest, 3, temurin@8, catsNative)
The job was canceled because "ubuntu-latest_2_12_temuri" failed.
Build and Test (ubuntu-latest, 3, temurin@8, catsNative)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
15.1 MB
15.1 MB
61.7 MB
51.4 MB
63.7 MB
52.4 MB
target-ubuntu-latest-temurin@8-3-catsJS
78.8 MB
target-ubuntu-latest-temurin@8-3-catsJVM
95.6 MB