feature(nyz&dcy): add LLM/VLM RLHF loss (PPO/GRPO/RLOO) #5348
Triggered via pull request
February 20, 2025 07:02
Status
Failure
Total duration
53m 20s
Artifacts
–
unit_test.yml
on: pull_request
Matrix: test_benchmark
Matrix: test_unittest
Annotations
10 errors
test_benchmark (3.10)
Process completed with exit code 2.
|
test_benchmark (3.8)
The job was canceled because "_3_10" failed.
|
test_benchmark (3.8)
The operation was canceled.
|
test_benchmark (3.9)
The job was canceled because "_3_10" failed.
|
test_benchmark (3.9)
The operation was canceled.
|
test_unittest (3.10)
The action 'do_unittest' has timed out after 40 minutes.
|
test_unittest (3.9)
The job was canceled because "_3_10" failed.
|
test_unittest (3.9)
The operation was canceled.
|
test_unittest (3.8)
The job was canceled because "_3_10" failed.
|
test_unittest (3.8)
The operation was canceled.
|