Skip to content

Upgrade to latest v2 blueprint structure #4049

Upgrade to latest v2 blueprint structure

Upgrade to latest v2 blueprint structure #4049

Triggered via pull request February 14, 2025 10:38
Status Failure
Total duration 11m 44s
Artifacts

ci.yml

on: pull_request
Matrix: allowed-fail-try-scenarios
Matrix: try-scenarios
Fit to window
Zoom out
Zoom in

Annotations

11 errors
embroider-safe
Process completed with exit code 1.
embroider-optimized
Process completed with exit code 1.
ember-lts-4.8
Process completed with exit code 1.
ember-lts-4.4
The job running on runner GitHub Actions 9 has exceeded the maximum execution time of 10 minutes.
ember-lts-4.4
The operation was canceled.
ember-default-with-jquery
The job running on runner GitHub Actions 1 has exceeded the maximum execution time of 10 minutes.
ember-default-with-jquery
The operation was canceled.
ember-lts-3.28
The job running on runner GitHub Actions 20 has exceeded the maximum execution time of 10 minutes.
ember-lts-3.28
The operation was canceled.
ember-classic
The job running on runner GitHub Actions 19 has exceeded the maximum execution time of 10 minutes.
ember-classic
The operation was canceled.