Upgrade to latest v2 blueprint structure #4049
Triggered via pull request
February 14, 2025 10:38
Status
Failure
Total duration
11m 44s
Artifacts
–
ci.yml
on: pull_request
Tests
1m 12s
Floating Dependencies
3m 13s
Matrix: allowed-fail-try-scenarios
Matrix: try-scenarios
Annotations
11 errors
embroider-safe
Process completed with exit code 1.
|
embroider-optimized
Process completed with exit code 1.
|
ember-lts-4.8
Process completed with exit code 1.
|
ember-lts-4.4
The job running on runner GitHub Actions 9 has exceeded the maximum execution time of 10 minutes.
|
ember-lts-4.4
The operation was canceled.
|
ember-default-with-jquery
The job running on runner GitHub Actions 1 has exceeded the maximum execution time of 10 minutes.
|
ember-default-with-jquery
The operation was canceled.
|
ember-lts-3.28
The job running on runner GitHub Actions 20 has exceeded the maximum execution time of 10 minutes.
|
ember-lts-3.28
The operation was canceled.
|
ember-classic
The job running on runner GitHub Actions 19 has exceeded the maximum execution time of 10 minutes.
|
ember-classic
The operation was canceled.
|