Update cairo-lang to 2.11.1 #5287
ci.yml
on: pull_request
Matrix: coverage
clippy
4m 7s
rustfmt
20s
udeps
1m 28s
test (linux, amd64)
2m 43s
test ubuntu old (linux, amd64)
3m 21s
Test (macOS, Apple silicon)
16m 49s
dockerfile (linux, amd64)
15m 59s
Upload Coverage
0s
Annotations
15 errors and 2 warnings
test (linux, amd64)
Process completed with exit code 2.
|
test ubuntu old (linux, amd64)
Process completed with exit code 2.
|
coverage (2)
There was an error when restoring cache: failed to find Scarb.lock
|
coverage (2)
Process completed with exit code 1.
|
coverage (1)
The job was canceled because "_2" failed.
|
coverage (1)
The operation was canceled.
|
coverage (1)
There was an error when restoring cache: failed to find Scarb.lock
|
coverage (3)
The job was canceled because "_2" failed.
|
coverage (3)
The operation was canceled.
|
coverage (3)
There was an error when restoring cache: failed to find Scarb.lock
|
coverage (4)
The job was canceled because "_2" failed.
|
coverage (4)
There was an error when restoring cache: failed to find Scarb.lock
|
coverage (4)
The operation was canceled.
|
Test (macOS, Apple silicon)
Process completed with exit code 2.
|
Test (macOS, Apple silicon)
There was an error when restoring cache: failed to find Scarb.lock
|
test ubuntu old (linux, amd64)
The Ubuntu-20.04 brownout takes place from 2025-02-01. For more details, see https://github.com/actions/runner-images/issues/11101
|
Test (macOS, Apple silicon)
These files were overwritten during the `brew link` step:
|