Skip to content

fix: add native ad compatibility layer #882

fix: add native ad compatibility layer

fix: add native ad compatibility layer #882

Triggered via pull request January 11, 2025 17:05
Status Cancelled
Total duration 10m 2s
Artifacts 1

tests_e2e_ios.yml

on: pull_request
Fit to window
Zoom out
Zoom in

Annotations

2 errors and 1 warning
iOS
Canceling since a higher priority waiting request for 'Testing E2E iOS-refs/pull/687/merge' exists
iOS
The operation was canceled.
iOS
Run script build phase '[CP-User] [Hermes] Replace Hermes for the right configuration, if needed' will be run during every build because it does not specify any outputs. To address this issue, either add output dependencies to the script phase, or configure it to run in every build by unchecking "Based on dependency analysis" in the script phase. (in target 'hermes-engine' from project 'Pods')

Artifacts

Produced during runtime
Name Size
simulator_log
165 Bytes