Skip to content

chore: upgraded golang version #6

chore: upgraded golang version

chore: upgraded golang version #6

Triggered via push January 17, 2025 14:03
Status Failure
Total duration 40s
Artifacts

pipeline.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

9 errors
Go 1.19
Process completed with exit code 1.
Go 1.23
The job was canceled because "_1_19" failed.
Go 1.23
The operation was canceled.
Go 1.21
The job was canceled because "_1_19" failed.
Go 1.21
The operation was canceled.
Go 1.20
The job was canceled because "_1_19" failed.
Go 1.20
The operation was canceled.
Go 1.22
The job was canceled because "_1_19" failed.
Go 1.22
The operation was canceled.