Pull requests: google/oss-fuzz
Author
Label
Projects
Milestones
Reviews
Assignee
Sort
Pull requests list
Add additional CCs for accessing connectedhomeip reports
ready to merge
#11963
opened May 16, 2024 by
andy31415
Loading…
build(deps-dev): bump the bundler group across 1 directory with 2 updates
dependencies
Pull requests that update a dependency file
ruby
Pull requests that update Ruby code
#11962
opened May 16, 2024 by
dependabot
bot
Loading…
build(deps): bump the maven group across 14 directories with 17 updates
dependencies
Pull requests that update a dependency file
java
Pull requests that update Java code
#11961
opened May 16, 2024 by
dependabot
bot
Loading…
[krb5] move fuzzers and build upstream
ready to merge
#11951
opened May 13, 2024 by
pkillarjun
Loading…
Added a devcontainer that can be used to run the oss-fuzz tooling in a GitHub Codespace or local devcontainer.
#11945
opened May 11, 2024 by
dlemstra
Loading…
POC: Speed up compilation by freezing container during compilation.
#11940
opened May 10, 2024 by
jonathanmetzman
•
Draft
[DO NOT MERGE] Pause
compile
just before compiling the fuzz target so that we can reuse it later.
ready to merge
#11937
opened May 10, 2024 by
DonggeLiu
Loading…
1 of 3 tasks
[trial_build] Temporarily disable testing of aarch64
#11934
opened May 9, 2024 by
jonathanmetzman
Loading…
librsvg: initial fuzz_target integration
ready to merge
#11929
opened May 8, 2024 by
correctmost
Loading…
ion-java: update CCs to include project maintainers and increase verbosity of build logs.
ready to merge
#11892
opened May 2, 2024 by
tgregg
Loading…
[dnsmasq] fix patch errors and rfc1035 driver parameters
#11779
opened Apr 3, 2024 by
swirsz
Loading…
Previous Next
ProTip!
Add no:assignee to see everything that’s not assigned.