Skip to content

chore(ci): strip CI to op-reth testing essentials #40

chore(ci): strip CI to op-reth testing essentials

chore(ci): strip CI to op-reth testing essentials #40

Triggered via pull request January 3, 2025 15:33
Status Cancelled
Total duration 6m 19s
Artifacts

unit.yml

on: pull_request
Matrix: doc
Matrix: test
Ethereum state tests
0s
Ethereum state tests
unit success
4s
unit success
Fit to window
Zoom out
Zoom in

Annotations

7 errors and 3 warnings
doc tests (optimism)
Canceling since a higher priority waiting request for 'unit-emhane/strip-ci' exists
doc tests (optimism)
The operation was canceled.
test / optimism (1/2)
Canceling since a higher priority waiting request for 'unit-emhane/strip-ci' exists
test / optimism (1/2)
The operation was canceled.
test / optimism (2/2)
Canceling since a higher priority waiting request for 'unit-emhane/strip-ci' exists
test / optimism (2/2)
The operation was canceled.
unit success
Process completed with exit code 1.
test / book (1/1)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
test / optimism (1/2)
Failed to save: "/usr/bin/tar" failed with error: The process '/usr/bin/tar' failed with exit code 1
test / optimism (2/2)
Failed to save: "/usr/bin/tar" failed with error: The process '/usr/bin/tar' failed with exit code 1