You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
The run_date output from Fetch_SRA_to_BAM appears to be retrieving the wrong SRA metadata field for the run date. Take for example SRR1972917 (and similar). The run_date returned is 2020-04-29, which must have something to do with the most recent time that SRA regenerated/reprocessed the data somehow (this appears to correspond to the SRALite reprocessing). I think the field we really want might be in EXPERIMENT_PACKAGE_SET. EXPERIMENT_PACKAGE .RUN_SET.RUN.published or something like that.... should be investigated/confirmed/fixed.
The text was updated successfully, but these errors were encountered:
The
run_date
output fromFetch_SRA_to_BAM
appears to be retrieving the wrong SRA metadata field for the run date. Take for example SRR1972917 (and similar). The run_date returned is2020-04-29
, which must have something to do with the most recent time that SRA regenerated/reprocessed the data somehow (this appears to correspond to the SRALite reprocessing). I think the field we really want might be inEXPERIMENT_PACKAGE_SET. EXPERIMENT_PACKAGE .RUN_SET.RUN.published
or something like that.... should be investigated/confirmed/fixed.The text was updated successfully, but these errors were encountered: