Infrastructure Planning
=======================
Here is an updated infrastructure planning system based on `our earlier work <https://github.com/SEL-Columbia/networkplanner>`_.
Here is an updated infrastructure planning system based on `our earlier work <https://github.com/SEL-Columbia/networkplanner>`_.


Install
Expand Down
17 changes: 16 additions & 1 deletion missions/ProductionCountdown-20161212.md
Original file line number Diff line number Diff line change
Expand Up @@ -39,17 +39,32 @@ I found a serious bug in the way that values are being interpolated in `interpol

+ Use parameters from minimum capacity if actual is less than minimum

20170224-1715 - 20170224-1800: 45 minutes

_ Consider renaming selected_technologies to ordered_technologies or ranked_technologies
+ Rename selected_technologies_text to technology_options

# Tasks

Make sure technology_options work properly
Update template to display properly

Rename "proposed cost per connection" to "proposed discounted cost per connection"
Add "proposed initial cost per connection"

Consider total population and % connected to compute unconnected household count
Rename household count to unconnected household count
Rename population count to unconnected population count
Grow population using total population
Size capacity using unconnected household count
Add preconnected_technology
Add preconnected_rate_as_percent_of_population

Consider estimating population growth using projected population year

Let user download example table for each table

Update executive summary by technology
Show connection count
Consider renaming selected_technologies to ordered_technologies or ranked_technologies

Consider preserving datetime fields in shapefiles
Original file line number Diff line number Diff line change
Expand Up @@ -31,60 +31,55 @@ Each technology has initial installation costs and recurring production, mainten

Mini-grid technologies include a central production facility and a low-voltage distribution network.

#### Selected Technologies
{selected_technologies_text}
{technology_options}


## Finance
The amount of money needed to fund an infrastructure project includes both initial and recurring costs. The initial costs are paid upfront and the recurring costs are paid later.

The net present value or discounted cost of an infrastructure project assumes that you will invest the money that you are not using now. For example, if a $110k project will start next year and if you are confident that you will earn at least 10% through investments, then you can request a loan for $100k one year in advance.

#### Year of Financing
{financing_year}

#### Time Horizon in Years
{time_horizon_in_years}

#### Discount Rate as Percent of Cash Flow per Year
{discount_rate_as_percent_of_cash_flow_per_year}


## Demography
Assume that population grows at a fixed rate each year. If the population is 100 and the growth rate is 10%, then the population will be 110 after the first year and 121 after the second year.

#### Demand Point Table
{demand_point_table}

To override a computed value for specific demand points, upload a CSV with an additional column. The column name should match the name of the variable that you are overriding. Variable names are available in the *glossary.csv* file that is generated after running this tool.

Note that if you leave a blank entry in a local override column, then the system will not override the value for that demand point.

{demand_point_table}

#### Population Year
{population_year}

#### Population Growth Rate as Percent of Population per Year
{population_growth_as_percent_of_population_per_year}

{preconnected_rate_as_percent_of_population}

## Geography
{preconnected_technology}

#### Line Length Adjustment Factor
The length of line used to connect two locations is often greater than the distance between the two locations.

## Geography

{line_length_adjustment_factor}

#### Average Distance Between Buildings in Meters
The length of line used to connect two locations is often greater than the distance between the two locations.

{average_distance_between_buildings_in_meters}

#### Peak Hours of Sun per Year
{peak_hours_of_sun_per_year}


## Consumption
Assume that consumption is fixed per capita. Estimate consumption based on the projected population.

#### Connection Type Table
{connection_type_table}

To override connection count and consumption by connection type for specific demand points, please use the following column name format in the *Demand Point Table* above:

- xyz_connection_count
Expand All @@ -102,15 +97,10 @@ The following column names in the *Demand Point Table* will override market coun
- market_connection_count
- market_consumption_in_kwh_per_year_per_market

{connection_type_table}

#### Number of People per Household
{number_of_people_per_household}

#### Consumption during Peak Hours as Percent of Total Consumption
{consumption_during_peak_hours_as_percent_of_total_consumption}

#### Peak Hours of Consumption per Year
{peak_hours_of_consumption_per_year}