Skip to content

Merge pull request #373 from MannLabs/add_rt_length_to_output_II #350

Merge pull request #373 from MannLabs/add_rt_length_to_output_II

Merge pull request #373 from MannLabs/add_rt_length_to_output_II #350

Triggered via push November 19, 2024 08:52
Status Failure
Total duration 2h 7m 24s
Artifacts

e2e_testing.yml

on: push
Matrix: End to end test
Fit to window
Zoom out
Zoom in

Annotations

5 errors
End to end test (astral)
Process completed with exit code 134.
End to end test (synchropasef)
The job was canceled because "astral" failed.
End to end test (synchropasef)
A task was canceled.
End to end test (astral_automatic_calibration)
The job was canceled because "astral" failed.
End to end test (astral_automatic_calibration)
The operation was canceled.