Skip to content

Merge pull request #372 from MannLabs/add_rt_length_to_output #349

Merge pull request #372 from MannLabs/add_rt_length_to_output

Merge pull request #372 from MannLabs/add_rt_length_to_output #349

Triggered via push November 19, 2024 08:51
Status Failure
Total duration 58m 24s
Artifacts

e2e_testing.yml

on: push
Matrix: End to end test
Fit to window
Zoom out
Zoom in

Annotations

6 errors
End to end test (astral_automatic_calibration)
Process completed with exit code 134.
End to end test (synchropasef)
The job was canceled because "astral_automatic_calibrat" failed.
End to end test (basic)
The job was canceled because "astral_automatic_calibrat" failed.
End to end test (basic)
The operation was canceled.
End to end test (astral)
The job was canceled because "astral_automatic_calibrat" failed.
End to end test (astral)
The operation was canceled.