Skip to content

feat: backend folder #4

feat: backend folder

feat: backend folder #4

Triggered via push February 18, 2025 11:10
Status Failure
Total duration 31s
Billable time 3m
Artifacts

pylint.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

5 errors
build (3.9)
Process completed with exit code 30.
build (3.10)
The job was canceled because "_3_9" failed.
build (3.10)
Process completed with exit code 30.
build (3.8)
The job was canceled because "_3_9" failed.
build (3.8)
The operation was canceled.