Skip to content

ci: update actions' versions #147

ci: update actions' versions

ci: update actions' versions #147

Triggered via pull request October 22, 2024 15:29
Status Failure
Total duration 21m 40s
Artifacts

ci.yml

on: pull_request
get_datasets
14s
get_datasets
Matrix: groovy_vs_cpp
Fit to window
Zoom out
Zoom in

Annotations

19 errors
groovy_vs_cpp (pass1/rgk_fa18_6.5GeV)
The artifact name is not valid: groovy_vs_cpp__pass1/rgk_fa18_6.5GeV. Contains the following character: Forward slash / Invalid characters include: Double quote ", Colon :, Less than <, Greater than >, Vertical bar |, Asterisk *, Question mark ?, Carriage return \r, Line feed \n, Backslash \, Forward slash / These characters are not allowed in the artifact name due to limitations with certain file systems such as NTFS. To maintain file system agnostic behavior, these characters are intentionally not allowed to prevent potential problems with downloads on different file systems.
groovy_vs_cpp (pass1/rgb_fa19)
The job was canceled because "pass1_rgk_fa18_6_5GeV" failed.
groovy_vs_cpp (pass1/rgb_fa19)
The operation was canceled.
groovy_vs_cpp (pass1/rgm_fa21)
The job was canceled because "pass1_rgk_fa18_6_5GeV" failed.
groovy_vs_cpp (pass1/rgm_fa21)
The operation was canceled.
groovy_vs_cpp (pass1/rgb_wi20)
The job was canceled because "pass1_rgk_fa18_6_5GeV" failed.
groovy_vs_cpp (pass1/rgb_wi20)
The operation was canceled.
groovy_vs_cpp (pass1/rgc_su22)
The job was canceled because "pass1_rgk_fa18_6_5GeV" failed.
groovy_vs_cpp (pass1/rgc_su22)
The operation was canceled.
groovy_vs_cpp (pass1/rga_sp19)
The job was canceled because "pass1_rgk_fa18_6_5GeV" failed.
groovy_vs_cpp (pass1/rga_sp19)
The operation was canceled.
groovy_vs_cpp (pass1/rgk_fa18_7.5GeV)
The job was canceled because "pass1_rgk_fa18_6_5GeV" failed.
groovy_vs_cpp (pass1/rgk_fa18_7.5GeV)
The operation was canceled.
groovy_vs_cpp (pass1/rga_fa18_inbending)
The job was canceled because "pass1_rgk_fa18_6_5GeV" failed.
groovy_vs_cpp (pass1/rga_fa18_inbending)
The operation was canceled.
groovy_vs_cpp (pass1/rgb_sp19)
The job was canceled because "pass1_rgk_fa18_6_5GeV" failed.
groovy_vs_cpp (pass1/rgb_sp19)
The operation was canceled.
groovy_vs_cpp (pass1/rga_fa18_outbending)
The job was canceled because "pass1_rgk_fa18_6_5GeV" failed.
groovy_vs_cpp (pass1/rga_fa18_outbending)
The operation was canceled.