Skip to content
This repository was archived by the owner on May 4, 2023. It is now read-only.

Configure Renovate #20

Open
wants to merge 1 commit into
base: master
Choose a base branch
from
Open

Configure Renovate #20

wants to merge 1 commit into from

Conversation

renovate[bot]
Copy link

@renovate renovate bot commented May 15, 2018

WhiteSource Renovate

Welcome to Renovate! This is an onboarding PR to help you understand and configure settings before regular Pull Requests begin.

🚦 To activate Renovate, merge this Pull Request. To disable Renovate, simply close this Pull Request unmerged.


Detected Package Files

  • package.json (npm)
  • .travis.yml (travis)

Configuration Summary

Based on the default config's presets, Renovate will:

  • Start dependency updates only once this onboarding PR is merged
  • Separate major versions of dependencies into individual branches/PRs
  • Do not separate patch and minor upgrades into separate PRs for the same dependency
  • Upgrade to unstable versions only if the existing version is unstable
  • Raise PRs immediately (after branch is created)
  • If semantic commits detected, use semantic commit type fix for dependencies and chore for all others
  • Keep existing branches updated even when not scheduled
  • Disable automerging feature - wait for humans to merge all PRs
  • Ignore node_modules, bower_components, vendor and various test/tests directories
  • Autodetect whether to pin dependencies or maintain ranges
  • Rate limit PR creation to a maximum of two per hour
  • Limit to maximum 20 open PRs at any time
  • Group known monorepo packages together
  • Use curated list of recommended non-monorepo package groupings
  • Ignore spring cloud 1.x releases
  • Ignore http4s digest-based 1.x milestones
  • Use node versioning for @types/node
  • Limit concurrent requests to reduce load on Repology servers until we can fix this properly, see issue 10133

🔡 Would you like to change the way Renovate is upgrading your dependencies? Simply edit the renovate.json in this branch with your custom config and the list of Pull Requests in the "What to Expect" section below will be updated the next time Renovate runs.


What to Expect

With your current configuration, Renovate will create 12 Pull Requests:

chore(deps): pin dependencies
chore(deps): update dependency ava to v0.25.0
  • Schedule: ["at any time"]
  • Branch name: renovate/ava-0.x
  • Merge into: master
  • Upgrade ava to 0.25.0
fix(deps): update dependency asar to ^0.14.0
  • Schedule: ["at any time"]
  • Branch name: renovate/asar-0.x
  • Merge into: master
  • Upgrade asar to ^0.14.0
chore(deps): update dependency ava to v3
  • Schedule: ["at any time"]
  • Branch name: renovate/ava-3.x
  • Merge into: master
  • Upgrade ava to 3.15.0
chore(deps): update dependency coveralls to v3
  • Schedule: ["at any time"]
  • Branch name: renovate/coveralls-3.x
  • Merge into: master
  • Upgrade coveralls to 3.1.0
chore(deps): update dependency eslint to v7
  • Schedule: ["at any time"]
  • Branch name: renovate/eslint-7.x
  • Merge into: master
  • Upgrade eslint to 7.29.0
chore(deps): update dependency eslint-config-airbnb to v18
  • Schedule: ["at any time"]
  • Branch name: renovate/eslint-config-airbnb-18.x
  • Merge into: master
  • Upgrade eslint-config-airbnb to 18.2.1
chore(deps): update dependency eslint-plugin-jsx-a11y to v6
  • Schedule: ["at any time"]
  • Branch name: renovate/eslint-plugin-jsx-a11y-6.x
  • Merge into: master
  • Upgrade eslint-plugin-jsx-a11y to 6.4.1
chore(deps): update dependency eslint-plugin-react to v7
  • Schedule: ["at any time"]
  • Branch name: renovate/eslint-plugin-react-7.x
  • Merge into: master
  • Upgrade eslint-plugin-react to 7.24.0
chore(deps): update dependency nyc to v15
  • Schedule: ["at any time"]
  • Branch name: renovate/nyc-15.x
  • Merge into: master
  • Upgrade nyc to 15.1.0
chore(deps): update dependency rimraf to v3
  • Schedule: ["at any time"]
  • Branch name: renovate/rimraf-3.x
  • Merge into: master
  • Upgrade rimraf to 3.0.2
fix(deps): update dependency asar to v3
  • Schedule: ["at any time"]
  • Branch name: renovate/asar-3.x
  • Merge into: master
  • Upgrade asar to ^3.0.0

🚸 Branch creation will be limited to maximum 2 per hour, so it doesn't swamp any CI resources or spam the project. See docs for prhourlylimit for details.


❓ Got questions? Check out Renovate's Docs, particularly the Getting Started section.
If you need any further assistance then you can also request help here.


This PR has been generated by WhiteSource Renovate. View repository job log here.

@coveralls
Copy link

coveralls commented May 15, 2018

Coverage Status

Coverage remained the same at 96.694% when pulling 739d78e on renovate/configure into 230e9a2 on master.

@renovate renovate bot force-pushed the renovate/configure branch from aa09d1d to 739d78e Compare August 27, 2020 04:55
Sign up for free to subscribe to this conversation on GitHub. Already have an account? Sign in.
Labels
None yet
Projects
None yet
Development

Successfully merging this pull request may close these issues.

2 participants