Skip to content

Major frontend refactor #1129

Major frontend refactor

Major frontend refactor #1129

Triggered via pull request November 19, 2025 18:56
Status Failure
Total duration 9m 18s
Artifacts

main.yml

on: pull_request
Matrix: host-x86
Matrix: preprocessor-host
Fit to window
Zoom out
Zoom in

Annotations

7 errors
preprocessor-host (clang, arm)
Process completed with exit code 126.
preprocessor-host (gcc, arm)
The strategy configuration was canceled because "preprocessor-host.clang_arm" failed
preprocessor-host (gcc, arm)
The operation was canceled.
preprocessor-host (clang, riscv)
The strategy configuration was canceled because "preprocessor-host.clang_arm" failed
preprocessor-host (clang, riscv)
The operation was canceled.
preprocessor-host (gcc, riscv)
The strategy configuration was canceled because "preprocessor-host.clang_arm" failed
preprocessor-host (gcc, riscv)
The operation was canceled.