Skip to content

Major frontend refactor #1123

Major frontend refactor

Major frontend refactor #1123

Triggered via pull request November 17, 2025 17:17
Status Failure
Total duration 9m 20s
Artifacts

main.yml

on: pull_request
Matrix: host-x86
Fit to window
Zoom out
Zoom in

Annotations

7 errors
host-x86 (gcc, riscv)
Process completed with exit code 1.
host-x86 (clang, riscv)
The strategy configuration was canceled because "host-x86.gcc_riscv" failed
host-x86 (clang, riscv)
The operation was canceled.
host-x86 (clang, arm)
The strategy configuration was canceled because "host-x86.gcc_riscv" failed
host-x86 (clang, arm)
The operation was canceled.
host-x86 (gcc, arm)
The strategy configuration was canceled because "host-x86.gcc_riscv" failed
host-x86 (gcc, arm)
The operation was canceled.