Major frontend refactor #1121
main.yml
on: pull_request
host-arm
9m 33s
coding-style
8s
Matrix: host-x86
Annotations
8 errors
|
coding-style
Process completed with exit code 3.
|
|
host-x86 (gcc, riscv)
Process completed with exit code 1.
|
|
host-x86 (clang, riscv)
The strategy configuration was canceled because "host-x86.gcc_riscv" failed
|
|
host-x86 (clang, riscv)
The operation was canceled.
|
|
host-x86 (gcc, arm)
The strategy configuration was canceled because "host-x86.gcc_riscv" failed
|
|
host-x86 (gcc, arm)
The operation was canceled.
|
|
host-x86 (clang, arm)
The strategy configuration was canceled because "host-x86.gcc_riscv" failed
|
|
host-x86 (clang, arm)
The operation was canceled.
|