Skip to content

Pull requests: openshift/release

Author
Filter by author
Label
Filter by label
Use alt + click/return to exclude labels
or + click/return for logical OR
Projects
Filter by project
Milestones
Filter by milestone
Reviews
Assignee
Filter by who’s assigned
Sort

Pull requests list

ipi-gcp-manual-oidc to clean up credentials after cluster approved Indicates a PR has been approved by an approver from all required OWNERS files.
#51964 opened May 13, 2024 by jstuever Loading…
LCA 4.14/4.16/main branch update
#51963 opened May 13, 2024 by jc-rh Loading…
Update Tech Preview Periodics lgtm Indicates that a PR is ready to be merged.
#51962 opened May 13, 2024 by patrickdillon Loading…
Add testing of the Calico CNI
#51961 opened May 13, 2024 by mrbojangles3 Loading…
WIP: Decouple OpenShift Pipelines installation and tests approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress.
#51960 opened May 13, 2024 by calebevans Loading…
horreum webhook integration
#51958 opened May 13, 2024 by shashank-boyapally Loading…
rhel9 building marketplace approved Indicates a PR has been approved by an approver from all required OWNERS files.
#51957 opened May 13, 2024 by grokspawn Loading…
OCPBUGS-33600: openshift-controller-manager: add hypershift conformance presubmit test jira/invalid-bug Indicates that a referenced Jira bug is invalid for the branch this PR is targeting. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#51954 opened May 13, 2024 by sjenning Loading…
OSSM-4504 Add integration helm test run approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. lgtm Indicates that a PR is ready to be merged.
#51953 opened May 13, 2024 by fjglira Loading…
Update installer shellcheck job trigger approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. lgtm Indicates that a PR is ready to be merged. rehearsals-ack Signifies that rehearsal jobs have been acknowledged
#51952 opened May 13, 2024 by rwsu Loading…
OCPEDGE-1093: fix: adding retries for dnf installs approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. rehearsals-ack Signifies that rehearsal jobs have been acknowledged
#51951 opened May 13, 2024 by jeff-roche Loading…
Adding orion test approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command.
#51950 opened May 13, 2024 by paigerube14 Loading…
[WIP] [NO-ISSUE] Attempt to fix assisted nutanix job do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress.
#51949 opened May 13, 2024 by eliorerz Loading…
Updating CI buils with AMD Roc images needs-ok-to-test Indicates a PR that requires an org member to verify it is safe to test.
#51945 opened May 13, 2024 by dibryant Loading…
CORS-3517: Add the GCP CAPI periodic test approved Indicates a PR has been approved by an approver from all required OWNERS files. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#51942 opened May 13, 2024 by barbacbd Loading…
CNF-10016: Mark ran latency performance as informing jobs do-not-merge/invalid-owners-file Indicates that a PR should not merge because it has an invalid OWNERS file in it. do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. needs-ok-to-test Indicates a PR that requires an org member to verify it is safe to test.
#51940 opened May 13, 2024 by fontivan Draft
[WIP] [DO NOT MERGE] debug advanced path do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress.
#51935 opened May 13, 2024 by Katka92 Loading…
Execute securesign e2e test suite approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress.
#51934 opened May 13, 2024 by bouskaJ Draft
Add the presubmit jobs for rosa Classic and HCP lgtm Indicates that a PR is ready to be merged.
#51932 opened May 13, 2024 by yasun1 Loading…
[HyperShift-agent] adjuest DEVSCRIPTS_CONFIG
#51931 opened May 13, 2024 by LiangquanLi930 Loading…
enable CAPI in CI jobs
#51930 opened May 13, 2024 by WenXinWei Loading…
Replace openshift-ci cluster pool with the pipelines cluster pool do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command.
#51929 opened May 13, 2024 by divyansh42 Loading…
chore(STONEINTG-836): integration-service to konflux-ci org lgtm Indicates that a PR is ready to be merged. ok-to-test Indicates a non-member PR verified by an org member that is safe to test. rehearsals-ack Signifies that rehearsal jobs have been acknowledged
#51928 opened May 13, 2024 by MartinBasti Loading…
OCPQE-22009: inject cli from release:target to replace extract_oc function jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#51927 opened May 13, 2024 by jianlinliu Loading…
ProTip! Mix and match filters to narrow down what you’re looking for.