Update dlt dependency from ^0.4.12 to latest #343
test.yml
on: pull_request
Matrix: test
lint | code & tests
2s
Annotations
6 errors
|
test (ubuntu-latest, 3.11.x)
Process completed with exit code 2.
|
|
test (ubuntu-latest, 3.9.x)
The operation was canceled.
|
|
test (ubuntu-latest, 3.9.x)
The strategy configuration was canceled because "run_tests.ubuntu-latest_3_11_x" failed
|
|
test (ubuntu-latest, 3.10.x)
The operation was canceled.
|
|
test (ubuntu-latest, 3.10.x)
The strategy configuration was canceled because "run_tests.ubuntu-latest_3_11_x" failed
|
|
lint | code & tests
Process completed with exit code 1.
|