You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
When using a Holiday as a Start Date for a schedule, FPP no longer picks this up as a valid schedule. It is not shown in the Preview, and does not start at the expected time.
Goto Content Setup - Scheduler
Edit existing, clone, or add new schedule row
Select "Thanksgiving" or "Black Friday" as Start Date
Select "Christmas" as End Date
Select any desired Start, End Times and Playlist
Save Schedule
Click Preview button. Newly added schedule does not appear.
Expected behavior:
Previously the schedule defined above would appear correctly in the Preview and play during the defined periods.
Additional context:
Just recently upgraded to 8.3.1, however this had been working in (I believe) 8.1 before mysteriously stopping about 1-2 weeks ago. I upgraded thinking it might solve the issue, but it still remains. FPP_Logs_20241204.0015.zip
Screenshots:
The text was updated successfully, but these errors were encountered:
FPP version 8.3.1 running on Raspberry PI 4
When using a Holiday as a Start Date for a schedule, FPP no longer picks this up as a valid schedule. It is not shown in the Preview, and does not start at the expected time.
Expected behavior:
Previously the schedule defined above would appear correctly in the Preview and play during the defined periods.
Additional context:
Just recently upgraded to 8.3.1, however this had been working in (I believe) 8.1 before mysteriously stopping about 1-2 weeks ago. I upgraded thinking it might solve the issue, but it still remains.
FPP_Logs_20241204.0015.zip
Screenshots:
The text was updated successfully, but these errors were encountered: