I am running Anvil for a home business, so I'm trying to reduce energy use/costs.
I'd like the DR node servers to be powered down until they're actually needed in DR event and selectively powered on.
I have an APC 7900B switched PDU on my DR rack as well.
I had a conversation with digimer on IRC about this feature, she said this is how it would work:
striker-boot-machine --host -> wait for access -> anvil-manage-dr --connect --server